Function Checks
The black ground Lead should be laid at right angles to the 20m wire and earthed at
the far end with a ground stake. The plug should be inserted in the connector on the
Signal Generator.
The Signal Generator is turned on with lowest power, and continuous mode selected.
The C.Scope Cable Avoidance Tool should then be held vertically above the longer wire,
approximately midway along it, ie. 10m from the Signal Generator.
The depth can then be measured. It is best to make a few readings at different depths.
(Beware - metal step ladders affect the accuracy!)